Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment

Product Details
Customization: Available
After-sales Service: Life Time Maintenance
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
  • Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
Find Similar Products

Basic Info.

Model NO.
HMJS-3
Specification
CE
Trademark
GOLDSOL
Origin
China
HS Code
9030339000
Production Capacity
20sets/Month

Packaging & Delivery

Package Size
45.00cm * 45.00cm * 60.00cm
Package Gross Weight
150.000kg

Product Description

I. Product introduction
We designed & produced Model no.HMJS-3 insulating boots ( gloves ) dielectric test equipment based on charged protective equipment insulation test procedures, and compliance with the majority of users opinions. The product has an effective solution for the past irregular testing method, thereby simplifying the testing procedures, improving the test speed. A more reliable identification of insulating boots ( gloves ) leakage current, insulation aging, power frequency withstand voltage and other parameters. To protect operator safety, so it is the ideal insulation boots ( gloves ) and special equipment.

It can be tested simultaneously 3 pair of insulating boots ( gloves ), and it can read leakage current of each glove to judge unqualified insulating boots ( gloves ); structure bottom assembly casters, it can freely move.

II. Working principle
0~220V power supply, regulating power frequency voltage withstand test according to the principle of electromagnetic induction of test transformer, to make transformer output 0~50KV high voltage to each electrode, so that insulating boots ( gloves ) obtain the test voltage specified. According to the insulating boots ( gloves ) test procedures, read, record test parameters.

Kits use wiring diagram shown as below( Micrometer 6 pics )

1.Boots & Gloves Testing Trolley
Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
 
2.Boots & Gloves testing connection
Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment

III. Structure design

Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
1.Control unit
1) Input voltage:    AC220V±10%  50/60Hz
2) Output voltage:   AC 0~30KV, or 0~50KV as per buyer's option                    
3) LV currency:  0~25A
4) Output capacitance:  0~5kVA
5) Timig range:      0~999S
6) Voltage accuracy:        ≤2% (F.S)
7) Currency accuracy:      ≤1.5% (F.S)
8) Leakage current: 0~50mA
9) Leakage current resolution: 0.1mA
10 Ambient temperature:    -20ºC~50ºC
11) Test number : 3 pairs each
12) GW/NW: 40kg/30kg                                           

Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment

2.Transformer
 1) Capacity:5KVA
 2) Input Voltage:AC200V 50Hz
 3) Power Input:25A
 4) Output Voltage:AC 0-50KV (AC 0~30KV for Boots & Gloves testing)    
 5) Power Output:AC 0-100mA
 6) Size: 360×255×650mm
 7) GW/NW: 65kg/50kg

3.Trolley equimpent, including trollery, moving bracket, sinks, electrode rod support...
   (Trolley with protective tools: NW42kg; GW70kg).
 Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment
        1) Moving bracket;
        2) Sink;
       3) Insulating rod
        4) Electrode rod support;
        5) High voltage terminal;
        6) Leakage measurement terminal

Gloves and Boots Insulating Dielectric Withstand Voltage Test Equipment

IV. Transport weight and demension:
Name of Commodity  Qty  G.W(KG)  N.W(KG) Measurement(CM)

Control unit

1 unit

40 kgs

30 kgs
 
57*40*50 cm

Booster

1 unit

65 kgs

50 kgs

45*40*85 cm

Inslation Test Trolley

1 unit

69 kgs

42 kgs

84*107*107cm
 
3 units

174 kgs

122 kgs
  
 1.23 m3

Packed in 3 wooden cases    (All Picture just for reference).
   
V. Accessories               
Sr no Description Qty
1 Power supply cable 1 unit
    2 Test cables 1 set
    3 Factory's test report 1 unit
    4 Operating manual 1 unit

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier